MS Project | SOLO/DUO
80.221.91.195:28015Down, checked 2d agoMonitored since 13 Sep 2026
Health checks
from the latest readings- ReachableOn the Steam server list, checked 2d agoFailing
- Capacity0% of 25 slots in usePassing
- Queuenobody waitingPassing
- Performancehas not answered a direct queryNo data
- Fresh mapwiped 4d agoPassing
- Next wipeThu 3 Dec, 19:00 UTC, in 9d 4hPassing
Activity
players each hour, last 48No hourly history yet.
- Group limit
- 8, the default
- Wipe schedule
- not published
- Map
- Procedural Map · 3500
Similar servers
The same kind of game, then region, group limit, rate and wipes.
- 1МИНИ-КАРТА 2Х | STORM | FPS+ 21.11EU · groups of 8+ · weekly · 127 on average5 / 100
- 2ShockRust | Blue | NoLimitno group limit · 105 on average146 / 400
- 3RETRO RUST #1 Х1000|NOLIMIT|LOOT++|KIT WIPE 24.11EU · groups of 16+ · weekly · 92 on average164 / 225
- 4404 RUST 2Х|ДЛЯ НОВИЧКОВ|СИБИРСКИЙ 24.11EU · groups of 16+ · monthly · 78 on average265 / 700
- 5404 RUST 2Х|ДЛЯ НОВИЧКОВ|РУССКИЙ 21.11EU · groups of 16+ · monthly · 62 on average43 / 1000
- 6ShockRust | Green | MAX 4no group limit · 61 on average66 / 250
Players
Every five minutes, from the Steam server list.
Hourly average and peak, UTC.
Daily average and peak, UTC.
Rank
daily · 1 is bestTop 69% of all ranked servers. Ranked on player hours over the last seven days.
Performance
48 hours: hourly readings. 30 to 90 days: a point a day, measured since 17 Sep. Low fps and a climbing entity count mean lag.
Wipe calendar
6 days with a wipe in the last 16 weeksIn 9d 4h. The force wipe · high confidence
- usual gap
- 35 days between real wipes
- on rhythm
- 75% of its recent wipes
- wipe-day peak
- 0 players, last three wipes
- crowd held
- 0% else halves by day 1
The first 48 hours of its last wipes
-
19 Nov
Thu 21:05 UTC peak 0 · running
-
5 Nov
Thu 19:00 UTC · force wipe – on before
-
15 Oct
Thu 20:05 UTC peak 0 · lasted 35 days
-
1 Oct
Thu 18:00 UTC · force wipe – on before
-
26 Sep
Sat 09:07 UTC peak 1 · lasted 19.5 days
-
17 Sep
Thu 20:03 UTC peak 1 · lasted 8.5 days
- Address
- 80.221.91.195:28015
- Region
- –
- Max players
- 25
- Group limit
- 8, the default
- Wipe schedule
- –
- Last wipe
- 19 Nov 2026, 21:05 UTC
- Hostname
- –
- First seen
- 13 Sep 2026
Server tags
What each tag it publishes means. Published as mp25,ptrak,$r?,v2633,gmrust,cs162929,ts8,^z,^y.
gmrustGame mode Survival in the standard Rust style.mp25Max players 25 player slots.ts8Group limit Teams are capped at 8, which is the game default.v2633Protocol Your game must be on protocol 2633 to join.cs162929Build The game build is 162929.ptrakNetworking The network layer is the game's standard, RakNet.$r?Region code A region code is not set.^zModded This server is listed as Modded, with plugins or settings that change the game.^yCarbon The plugin framework Carbon is installed.Flag meanings are Facepunch's.
Population
What is the rank of MS Project | SOLO/DUO?
For player hours over seven days, MS Project | SOLO/DUO holds rank #14,939, in the top 69% of all ranked servers.
What is the population of MS Project | SOLO/DUO?
Currently offline, MS Project | SOLO/DUO was last seen 2 days 1 hours ago. Averaged across the last seven days, the player count is 0.
Rules and settings
Which map is active on MS Project | SOLO/DUO?
A procedural map of size 3,500 with seed 245774532 runs on MS Project | SOLO/DUO, produced by the game. Because size and seed determine the map, a RustMaps view is available from this page.
What are the settings and rules for MS Project | SOLO/DUO?
No gather rate appears in the name of MS Project | SOLO/DUO. Group size follows the game default of 8 players. It runs survival, the usual game: gathering, building and raiding. Combat between players is allowed, and bases can be raided. The server browser lists it as Modded: plugins or settings change gameplay. The plugins it uses are Carbon. VAC by Valve is on.
Wipe details
What happens on MS Project | SOLO/DUO during wipe day?
On average, the peak across recent wipes was 0 players. 0 hours after the latest wipe, the crowd reached its peak. Until the next wipe, the crowd remained above half the peak in 0% of recent wipes. Otherwise, it dropped below half by day 1.
On what schedule does MS Project | SOLO/DUO wipe?
Wipes on MS Project | SOLO/DUO follow this rhythm: every 5 weeks on Thursday at 21:05 UTC. Its next wipe is due Thursday 3 December at 19:00 UTC, at the force wipe that clears every Rust server. 4 days 17 hours is the age of the current world.
Server tags
How should you read the tags on MS Project | SOLO/DUO?
gmrust (Game mode): Survival in the standard Rust style; mp25 (Max players): 25 player slots; ts8 (Group limit): Teams are capped at 8, which is the game default; v2633 (Protocol): Your game must be on protocol 2633 to join; cs162929 (Build): The game build is 162929; ptrak (Networking): The network layer is the game's standard, RakNet; $r? (Region code): A region code is not set; ^z (Modded): This server is listed as Modded, with plugins or settings that change the game; ^y (Carbon): The plugin framework Carbon is installed are the tags MS Project | SOLO/DUO publishes; the game's server browser reads them. At the top of this page you will find its current players, its queue and the making of its world, all from the tags.
What lists and filters on Best Rust Servers hold MS Project | SOLO/DUO?
The Best Rust Servers lists that MS Project | SOLO/DUO fits are: Best modded Rust servers. You will find it on the server list under: Type: Modded; Server tag: Modded ^z and Carbon ^y; Group limit: 5 or more; Last wipe: In the last week.
About the server
What is the Rust version on MS Project | SOLO/DUO?
The Rust version on MS Project | SOLO/DUO is network protocol 2633 and build 162929, running on Linux. Your game needs the same protocol to connect, and Steam updates it automatically.
Where can MS Project | SOLO/DUO be found?
There is no published region for MS Project | SOLO/DUO. Best Rust Servers does not look up where the machine stands; it shows where a server says it is. You can reach it at 80.221.91.195:28015.
How reliable is MS Project | SOLO/DUO and is it online?
Down right now, MS Project | SOLO/DUO was last seen 2 days 1 hours ago. In the last 7 full days, 65 of 168 hours were online, an uptime of 39%. The date Best Rust Servers first observed it is 13 September 2026.
How to join
What are the steps to join MS Project | SOLO/DUO?
Enter client.connect 80.221.91.195:28015 in the console after pressing F1 in Rust. Or use Launch Rust on this page, which opens Rust via Steam and connects.
